Oversee · Owner's Engineer

Technical authority on your side.

Illustration

Many solar plants are run by several parties: an O&M contractor, a SCADA vendor, equipment manufacturers and the DISCOM. Each reports on its own part, and no one is accountable for the whole. As your Owner's Engineer, Renevik reads the plant as a whole on your behalf, holds each vendor to its obligations, and gives you an independent technical view before you approve any spend.

Renevik provides Owner's Engineer services for solar plants in India, during construction and in operation. For operating plants, we review generation against design, check vendor obligations and supervise technical follow-up, so you can decide what work to approve from a checked record.

Two moments, one Owner's Engineer

While it is built, and while it runs.

Who this is for · both moments

Owners, developers, O&M companies and lenders.

Plant owners and IPPs

With portfolios run by third-party vendors.

Developers

Who want an independent technical view of plants before or after acquisition.

O&M companies

That want verified performance data for the plants they maintain.

Lenders

Banks and financial institutions with solar exposure, through the Lender's Engineer service below.

In operation · why it matters

Who checks the plant for the owner?

The EPC contractor built the plant, the O&M company runs it and the SCADA system reports on it, and each of them checks its own work. An Owner's Engineer checks all three on your behalf, against the billing meter.

28 of 30

plants we measured in one Indian owner's portfolio made less than 95% of their P90 expected yield.

In the United States, 1 in 4 solar projects misses its production target by more than 10% (kWh Analytics, Solar Generation Index 2020).

Case study · one portfolio, 32 plants

What we found on one owner's 32 plants.

A portfolio of 32 plants in Maharashtra, 255.6 MWp DC, read in October 2026. Renevik had no EPC, O&M or design role at these plants, and no plant is named.

Every plant against its P90 expected yieldThirty measured plants; the two hatched bars are start-ups in their first month.
Value a year, plant by plant, at 95% of P90₹ crore, largest first. An estimate, not a promise.
Plants by their share of P90The thirty measured plants.

Measured Estimate or assumed 95% of P90

Site survey · 3 of the 32 plants

Inside three plants, eight kinds of fault.

We surveyed three of the plants, 24.0 MWp DC in all, and recorded every finding with a marked photograph.

Illustration of a SCADA display with a missing daylight reading
SCADA reads 0.0 in daylight.
Illustration of inverters omitted from the plant's monitoring record
Three of seven inverters are not counted.
Illustration of cracked solar module glass
Cracked module glass.
Illustration of burn marks at an electrical terminal
Burn marks, a fire risk.

Where each fault was seen Plant 1 · 2 · 3

What we do for you

For plants already in operation.

The O&M, SCADA and equipment vendors continue to carry out the work on site, and you continue to appoint them and approve all spend. Our role is to review, supervise and recommend.

Daily performance review

VIKAS reconciles SCADA data, daily generation reports and billing-meter readings, and our engineers follow up every fault and every gap in the data.

Monthly and quarterly reporting

A monthly performance report against design, and a quarterly review with your team.

Vendor oversight

We track O&M performance, check vendor payment claims, and monitor every contract obligation and guarantee, including defect-liability dates.

DISCOM and settlement

We support joint meter readings and reconcile settlement bills with the generation record.

Equipment and warranty

We work with the manufacturers on faults, repairs and warranty claims.

Spend review

We review maintenance budgets and proposed works technically before you approve them.

Safety and response

We carry out safety inspections, and an engineer reaches the site within 24 hours when a plant needs one.

How we work

Four principles behind every finding.

For the owner

The vendors carry out the work, we supervise it, and you approve every spend.

Evidence

Every finding comes with a marked photograph.

Daily

VIKAS Intelligence Platform reads the plant every day.

Proved on the meter

A fault is closed only when the billing meter shows the recovery.

  1. Survey
  2. Test
  3. Follow up
  4. Verify

The owner's daily view

See what needs attention.

VIKAS Generation Dashboard (VGD) brings the plant's generation, performance against design and engineering follow-up into one view. It is the owner's view of the record checked through VIKAS Intelligence Platform.

Each day, you can see the readings available for your plant, the gaps that need checking and the issues being followed up. Measured generation stays separate from estimated losses, and missing data is flagged.

VIKAS Generation Dashboard demo: the plant overview on a laptop — live power, plant performance, months against expected yield, the plant drawn with its readings, and the money back
The same overview on a phone
The live demo of VIKAS Generation Dashboard shows an invented plant, not a client's. Try it.

When a plant needs more

Diagnosis and recovery for underperforming portfolios.

Where a plant is producing below its design, we can carry out a detailed inspection and testing programme, quantify the loss at each site in MWh, and set out a rectification plan with the cost and payback of each item.

We then supervise the rectification, re-test the work, and confirm the recovery on the billing meter. Each piece of work is scoped and quoted separately.

  1. Survey
  2. Test
  3. Follow up
  4. Verify

Lender's Engineer

For the banks that fund solar plants.

Which funded plant is losing money, why, and what fixes it, every month, from the billing meter.

A plant that makes less than its P90 expected yield earns less, so its borrower's cash flow falls and the loan's debt-service cover weakens. A bank usually sees the weaker cover months later, and rarely sees why.

As Lender's Engineer, appointed by the borrower at the bank's request, we read each funded plant every day and send the bank one page a month for each plant: its output against P90, the cause of any shortfall, and a red, amber or green flag for the risk to debt-service cover.

1

A health check to begin

We start with one to three plants the bank funds, and show the bank what the record says.

2

Plants in operation first

We start where VIKAS already reads the record every day, with plants in operation.

3

Early warning

The bank hears from us within seven days of a material shortfall.

4

A quarterly site visit

An engineer visits every funded plant once a quarter.

The wall: we never act as Owner's Engineer or Lender's Engineer on a plant we built, own or bid for, and that is written into every contract.

Getting started

Start in three steps.

  1. Site survey.

    We visit the plant, test what matters and record every finding with a marked photograph.

  2. Scope form.

    Together we fix the plants, the services and the reports you will receive.

  3. Day one.

    VIKAS starts reading the plant, and the daily watch begins.

Questions about oversight

Before we read your plant.

What does a solar Owner's Engineer do?

An Owner's Engineer reviews the plant on the owner's behalf. Renevik checks performance against design, reviews vendor obligations and supervises technical follow-up. The owner continues to appoint vendors and approve spend.

How does VGD differ from SCADA?

SCADA records signals from plant equipment. VIKAS Generation Dashboard presents the checked generation record, performance against design and engineering follow-up. Renevik's engineers review discrepancies and follow up with the responsible vendors.

Can I try VGD before discussing my plant?

Yes. Try the demo to explore an invented plant with sample data. Existing owners use Owner login to reach the record they are authorised to see.

Does missing data mean the plant generated no power?

No. Missing data is flagged for checking. It is not counted as zero generation. Measured generation and estimated losses are shown separately so the record keeps its basis.

Does Renevik offer a solar Lender's Engineer service?

Yes. As Lender's Engineer, appointed by the borrower at the bank's request, we read each funded plant every day and send the bank one page a month for each plant. Renevik does not act as an independent engineer on a plant it built or owns. Contact our team to discuss the scope required.

Your portfolio

Start with what your plants are doing today.

Tell us about the plants, who runs them and what they report. We will show you how we would read them on your behalf.