Why is my solar plant producing less than its design?

The short answer. A plant falls short of its design because it is losing energy, or because its record is wrong. Both are found by reading generation against the P90 expected yield and the billing meter, not against SCADA alone.

When the record is wrong

When the plant is losing energy

How to check

Read each month's generation against the plant's P90 expected yield, adjusted for grid unavailability and weather. Reconcile SCADA data, daily generation reports and billing-meter readings. Where the gap stays, an inspection and testing programme puts each loss in MWh and sets out what fixes it, with its cost and payback.