VIKAS Intelligence Platform

VIKAS

Read every day. Explained to people.

350 MWp

of solar assets read by VIKAS.

Every day

Generation, SCADA, O&M reports and bills, reconciled.

Signed off

Our engineers own every recommendation that reaches a client.

Renevik uses VIKAS Intelligence Platform to draw and check engineering drawing sets, track plants being built, reconcile plant data, compare generation with design, and support its engineers' follow-up. VIKAS Generation Dashboard (VGD) gives owners a view of that checked record.

VIKAS reads every plant we build, own or oversee every day, reconciles what each source says, compares the result with the plant's design, and tells our engineers what needs attention, why it matters and what to ask next.

VIKAS was built on Renevik's own plants and grows with every asset we build, own or oversee. The more it reads, the more precisely it can tell a normal month from an early warning.

How VIKAS learns

It learns faster than any one engineer.

An engineer learns from the plants they work on, a few a year, and the lessons stay in one head. VIKAS learns from every plant it reads, every paper and every correction, and turns each lesson into a check it runs on every set.

One engineer

  1. Plant 1
  2. a year later, plant 2
  3. a year later, plant 3

A lesson learnt on one plant may not reach the next drawing, or the next engineer.

VIKAS

  1. Every plant, read every day
  2. Every paper, read and noted
  3. Every correction, made a check

A correction made today is checked on every sheet of every set tomorrow.

273

engineering sources catalogued in two days, 62 of them read in full: standards, textbooks and field studies.

62

design rules, each tied to its source; the checks built from them run by code on every set.

350 MWp

of solar assets read by VIKAS, so the rules meet real plants.

How it reaches a conclusion

Built by engineers, governed by rules, signed off by people.

VIKAS reads and reconciles large volumes of plant data, but reading data is only the start.

Its conclusions come from Renevik's own engineering rules, verified data sources and a governed risk framework, and our engineers own every recommendation that reaches a client. The result is judgement that is written down, checked and improved with every plant, rather than held in one person's head.

How VIKAS reads risk

From a reading to a closed issue.

Every flag follows the same path, and an issue is closed only when the meter shows the plant has recovered.

  1. Data inGeneration, SCADA, O&M reports and bills, every day.
  2. Checked against designEach plant against its own P90 model and its rules.
  3. FlaggedA shortfall, a gap or a disagreement between sources.
  4. An engineer follows upWith the site, the vendor or the client, by name and date.
  5. Closed on the meterThe billing meter shows the recovery, and the lesson becomes a rule.

Plant issues, month by month Opened Closed

How VIKAS works

Five layers.

1

The record layer

Generation, SCADA data, O&M reports and electricity bills for every plant, brought into one checked record each day. Where two sources disagree, the discrepancy is recorded and followed up, and missing data is flagged rather than treated as zero.

2

The engineering layer

Each plant's design baseline and P90 model, a growing library of fault and performance rules written by Renevik engineers, and the 62 design rules behind every drawing set.

3

The risk layer

Governed parameters applied across the whole portfolio: performance against design, curtailment and outages, vendor obligations, receivables and the risks that build up quietly over months.

4

The decision layer

A daily view of what needs attention, who owns it and what was asked last month, so nothing is lost between reviews.

5

The learning layer

Every issue we close becomes a rule for the next plant. The platform becomes sharper with every MW it reads.

The owner's view

Two dashboards, one record.

VIKAS EPC Dashboard (VED) shows a plant while it is built: each site's stages, what is blocked and by whom, the drawings issued and the material ordered. VIKAS Generation Dashboard (VGD) shows it once it runs: generation against design, data gaps and engineering follow-up.

Both are read by VIKAS Intelligence Platform and checked by our engineers. Each has a live demo on invented data.

VIKAS Generation Dashboard demo: the plant overview on a laptop: live power, plant performance, months against expected yield and the money back
The same overview on a phone
VIKAS Generation Dashboard (VGD), the owner's view of a running plant. The live demo shows an invented plant, not a client's. Try it.

What you see

Five views, from the first drawing to the twenty-fifth year.

Drawing sets

Full plant drawing sets from Renevik Engineering in 5 working days, every number calculated and checked by code against our design rules. See Renevik Engineering.

VIKAS EPC Dashboard

The owner's view of a plant being built: each site's stages, what is blocked and by whom, the drawings issued and the material ordered. Explore VED.

VIKAS Generation Dashboard

The owner's view of generation against design, data gaps and engineering follow-up. Explore VGD.

The monthly report

Generation, energy credited, outages and their causes, and the next actions, in rupees as well as units.

The risk view

The portfolio's exposure across performance, grid and vendor risk.

Questions about the platform

How the record is read.

What is VIKAS Intelligence Platform?

VIKAS Intelligence Platform reconciles generation, SCADA data, operation and maintenance reports, and electricity bills. It compares the checked record with the plant's design and tells Renevik's engineers what needs attention.

What is VIKAS Generation Dashboard?

VIKAS Generation Dashboard (VGD) is the owner's view of the checked plant record. It presents generation against design, data gaps and engineering follow-up. See the dashboard views or try the demo.

What is VIKAS EPC Dashboard?

VIKAS EPC Dashboard (VED) is the owner's view of a plant being built: each site's construction stages, the blocks and who owns them, the drawings issued and the material ordered. See it on a sample project or try the demo.

Does VIKAS draw engineering drawings?

Yes. VIKAS Intelligence Platform calculates and draws every sheet of a solar plant drawing set from the site's data, and checks each number by code. Renevik's engineers review every sheet, and no sheet is issued for construction until a licensed engineer stamps it. See Renevik Engineering.

Who is responsible for engineering recommendations?

Renevik's engineers review the evidence and own the recommendations that reach a client. The platform supports the review; the owner continues to approve spend and appoint vendors.

A walkthrough

See VIKAS on your plant.

We will walk you through the dashboards, the monthly report and the risk view, and show how VIKAS would read your plant, your build or your portfolio.