Illustration: a solar plant beside a steel mill

Independent power producer · Engineering · EPC · Owner's Engineer

Own your power.

Illustration

Renevik develops, engineers, builds, owns and oversees solar assets for industry. Every one of them is read every day by VIKAS Intelligence Platform, so its performance is known, explained and acted on.

Independent power producer24MW DC

co-owned across six sites in Maharashtra

350MWp

of solar assets read by VIKAS

6

states: Gujarat, Maharashtra, Goa, Punjab, Karnataka and Tamil Nadu

What we do

One company across the life of an energy asset.

An industrial solar plant is a 25-year asset. The decisions made before construction decide what it earns after commissioning, and the discipline after commissioning decides whether it keeps earning. Renevik works across that whole life, in four ways.

01 · Independent power producer

Own.

We invest our own capital in solar plants and sell the power under long-term agreements. Owning assets makes us accountable for their returns, and it shapes how we build for everyone else.

Read more about Own →

02 · Renevik Engineering

Engineer.

We draw full solar plant sets for other EPCs and developers in 5 working days from complete inputs, where the market takes 2–6 weeks: layouts, single line diagrams, studies and the handover pack, every sheet checked.

Read more about Engineer →

03 · Engineering, procurement and construction

Build.

We design and build ground-mounted and rooftop plants for energy-intensive industry, engineered for the site, the load and the grid connection rather than for panel count.

Read more about Build →

04 · Owner's Engineer

Oversee.

As Owner's Engineer, we check a plant for its owner while it is built and while it runs: hold-point checks on site, daily performance review, vendor oversight and technical authority on the owner's behalf.

Read more about Oversee →

A 25-year asset

The life of a solar plant, and where Renevik works in it

Read every day. Explained to people.

VIKAS

Built by engineers, governed by rules, signed off by people.

VIKAS reconciles each plant's generation, SCADA data, O&M reports and electricity bills every day, checks them against the plant's design, and tells our engineers what needs attention and why.

It is built on Renevik's own engineering rules and verified plant data, with people setting the rules and signing off the conclusions. Every issue we close becomes a rule for the next plant, so the platform improves with every MW it reads.

1

The record

Generation, SCADA, O&M reports and bills in one checked record each day. Missing data is flagged, never treated as zero.

2

The engineering

Each plant's design baseline and P90 model, with a growing library of fault and performance rules.

3

The risk

Performance against design, curtailment, outages, vendor obligations and the risks that build up quietly.

4

The decision

A daily view of what needs attention, who owns it and what was asked last month.

5

The learning

Every issue we close becomes a rule for the next plant.

Explore the platform →

Who we work with

Built for the people who run, fund and own energy assets.

Industrial businesses

Lower, more predictable power costs from a plant engineered for their operations.

EPC companies

Full drawing sets and design checks from Renevik Engineering.

Plant owners and developers

Independent technical oversight while a plant is built and once it runs.

Lenders and financial institutions

Confidence that the assets they fund perform as designed.

O&M companies

A clearer, verified view of the plants they maintain.

Where we work

Plants, sites and teams.

Tap a plant.

Illustration: a metering cabinet and a substation transformer beside a solar plant
Illustration

The record

We publish how our plants perform, including the difficult months.

In September 2026, IPCL's 4.0 MWp plant in Gujarat made 57% of its P90 expected yield, and 89% once GETCO's grid orders and the weather are counted. We show that month beside the good ones, because a record that hides its bad months is not a record.

Regency Ispat Pvt. Ltd.

Solapur, Maharashtra · 4.5 MWp · % of P90 expected yield, 2026

Seven of eight months at or above P90 once grid orders and the weather are counted. August made 94%, and 100% with them.

Read the figures
Feb98%
Mar100%
Apr105%
May102%
Jun122%
Jul107%
Aug94%
Sep116%

Owner's Engineer

Who checks the plant for the owner?

The EPC contractor built the plant, the O&M company runs it and the SCADA system reports on it, and each of them checks its own work. An Owner's Engineer checks all three on your behalf, against the billing meter.

28 of 30

plants we measured in one Indian owner's portfolio made less than 95% of their P90 expected yield.

See what we found
  1. 01

    Survey

    We inspect the plant and record what we find.

  2. 02

    Test

    We check each cause against equipment and meter records.

  3. 03

    Follow up

    We hold each vendor to the agreed work.

  4. 04

    Verify

    We close a finding only when the billing meter shows the result.

VIKAS Generation Dashboard demo: the plant overview on a laptop: live power, plant performance, months against expected yield and the money back
The same overview on a phone
VIKAS Generation Dashboard (VGD), the owner's view of a running plant. The live demo shows an invented plant, not a client's. Try it.

Start with your asset

See what VIKAS shows about a plant.

Tell us about your plant, project or portfolio. We will walk you through the dashboard, the monthly report and the risk view, and show how they would apply to your assets.