Illustration: two engineers checking a drawing on a solar plant under construction

Build · Engineering, procurement and construction

Solar engineered around your operations.

Illustration

A steel plant, a foundry, a textile mill and a chemical unit each use power differently. Their load curves, shifts, shutdowns, tariffs and grid conditions differ, so their solar plants should too. We design and build each plant for the site, the load and the grid connection it actually has.

Renevik provides engineering, procurement and construction (EPC) for commercial and industrial solar plants, including ground-mounted and rooftop projects in Gujarat and Maharashtra. We assess the site, design the plant, manage construction and commissioning, and review its performance in operation.

What you get

One team, accountable from land to operation.

One accountable team

From land and feasibility to commissioning and operation, so nothing falls between contractors.

Precision over size

We engineer the plant your economics need, not the largest one we can sell.

Performance without overspend

Premium engineering where it changes the result, and no cost where it does not.

A plant that is read from day one

Every plant we build is connected to VIKAS Intelligence Platform, so its performance is checked against design from the first month.

From survey to operation

Six stages, one team.

  1. Land and feasibility.

    We identify land near substations and assess grid access, road access, clearances and due diligence.

  2. Site evaluation.

    Soil and geotechnical testing, topographical survey, electrical resistivity testing and wind-speed data establish the ground and weather conditions.

  3. Commercial and regulatory structuring.

    We advise on the right route for your plant, whether captive, group captive, open access or a power purchase agreement, and manage approvals and grid interconnection.

  4. Engineering design.

    Site-specific modelling of irradiation, terrain and consumption selects the structure (fixed tilt, seasonal tilt or single-axis tracker) and sets a conservative P90 design yield before the price is fixed. The drawings come from Renevik Engineering, every sheet checked by code and by our engineers.

  5. Construction and quality assurance.

    A dedicated project manager and site in-charge run procurement and construction, with third-party inspection at module production, pre-dispatch and commissioning. An owner can also appoint an independent Owner's Engineer during construction.

  6. Operation and performance.

    After commissioning, we maintain the plant and track its output against design through VIKAS.

Plants we have built

Plants built for industry.

We build for steel, foundries, chemicals and textiles: ground-mounted plants, and rooftop plants for industrial and commercial sites.

ClientLocationCapacityType
Investment & Precision Castings Ltd. (IPCL)Bhavnagar, Gujarat4.0 MWpGround-mounted, single-axis trackers, 11 kV open access
Regency Ispat Pvt. Ltd.Solapur, Maharashtra4.5 MWpGround-mounted, open access
Diamond TMTBhavnagar, Gujarat0.7 MWpGround-mounted, captive
RPJ Hotel (P.P. Developers)Sayla, Surendranagar, Gujarat0.7 MWpGround-mounted, captive
Sovereign Metals Ltd.Ahmedabad, Gujarat0.45 MWpRooftop, captive
Vitrum Slimline Systems Pvt. Ltd.Jamnagar, Gujarat0.2 MWpRooftop

The record · how we measure

One basis, every month.

A plant's capacity tells you what was built. Its record tells you what it delivers. We publish the monthly performance of the plants VIKAS reads, measured on the same basis every month, with the good months and the difficult ones side by side.

We compare each plant's measured generation with its P90 design yield. P90 is a conservative estimate: the level of generation the plant should exceed in nine years out of ten.

Where generation was lost to outages or grid instructions, we record the cause beside the result, but we never add estimated losses back into measured generation. A shortfall is shown as a shortfall.

How they perform

Each plant against its P90 expected yield.

The plants we built, measured every month against the yield their design should exceed in nine years out of ten. The line is P90; the shaded part is what grid orders and the weather took.

Made, measured Grid orders and weather, estimate P90

Plant records

Four plants, read every month.

Regency Ispat Pvt. Ltd.

Solapur, Maharashtra · 4.5 MWp

From February to September 2026, Regency's plant made 105% of its P90 expected yield. Once grid orders and the weather are counted, it was at or above P90 in seven of the eight months; August made 94%, and 100% with them.

Investment & Precision Castings Ltd. (IPCL)

Ratanpar, Bhavnagar, Gujarat · 4.0 MWp

From April to September 2026, IPCL's plant generated 29,88,611 kWh, a CUF of 17.0% on DC, and reached 88% of its P90 expected yield, adjusted for the trackers starting on 21 May. August and September fell short, at 68% and 57%: GETCO's grid instructions curtailed output on 12 and 16 days, and the plant's own outages took 6 and 7 days. On IPCL's six electricity bills from March to August, solar saved Rs 1.74 crore after wheeling and banking charges.

Diamond TMT

Gujarat · 0.7 MWp

From March to August 2026, the plant generated 579 MWh against a P90 design yield of 558 MWh, about 4% above design.

RPJ Hotel (P.P. Developers)

Sayla, Surendranagar, Gujarat · 0.7 MWp

From September 2025 to August 2026, RPJ's plant made 102% of its P90 expected yield, at or above P90 in seven of the twelve months. These months come from the plant's own monitoring record, so they carry no grid or weather detail.

Regency Ispat Pvt. Ltd.

Solapur, Maharashtra · 4.5 MWp · % of P90 expected yield, 2026

Seven of eight months at or above P90 once grid orders and the weather are counted. August made 94%, and 100% with them.

Read the figures
Feb98%
Mar100%
Apr105%
May102%
Jun122%
Jul107%
Aug94%
Sep116%

Where the units went

Made, then what the grid, the weather and our own outages took.

Made, measured Grid orders, estimate Weather, estimate Our own outages P90

One day, every five minutes

A day at a plant we built.

Read by VIKAS

Your build, as it happens

See every stage of your plant.

Every plant we build has its own page in VIKAS EPC Dashboard (VED): each site's stages, what is blocked and by whom, the drawings issued and the material ordered. Once it runs, the same record moves into VIKAS Generation Dashboard (VGD).

VIKAS EPC Dashboard on a laptop: a sample project's construction stages across four sites, with drawings issued and material ordered
The same stages on a phone
VIKAS EPC Dashboard (VED), the owner's view of a plant being built. The live demo shows an invented project, not a client's. Try it.

Questions about building

Before a plant is designed.

What does solar EPC include?

EPC means engineering, procurement and construction. Renevik's work covers site assessment, commercial and regulatory structuring, engineering design, construction, quality assurance and commissioning. The agreed scope sets out each party's responsibilities.

Does Renevik build C&I solar plants in Gujarat and Maharashtra?

Yes. Renevik builds commercial and industrial solar plants in Gujarat and Maharashtra, including ground-mounted and rooftop projects. The design depends on the site's land or roof, the business's load and the grid connection.

How is a solar plant's output checked after commissioning?

Renevik compares measured generation with the plant's design baseline and records the causes of shortfalls. Measured generation remains separate from estimated losses. Explore VGD to see the owner's view of performance and follow-up.

Can Renevik review a plant built by another contractor?

Yes. Renevik's Owner's Engineer service reviews operating plants on the owner's behalf, and checks plants under construction at every stage. The owner appoints the vendors and approves spend; Renevik reviews, supervises and recommends.

A new plant

Start from your site and your load.

Tell us where the plant would sit and how your operation uses power. We will start from the site, the load and the grid connection.