What is P90 expected yield?
The short answer. P90 expected yield is the yearly energy a solar plant is expected to exceed with 90% probability, which is nine years out of ten. It is a cautious figure, set from the PVsyst simulation report and the site's irradiance data.
How it is set
On a plant Renevik builds, site-specific modelling of irradiance, terrain and consumption selects the structure (fixed tilt, seasonal tilt or single-axis tracker) and sets the P90 design yield before the price is fixed.
When it is fixed
At handover, from the as-built design, and signed with the test records. From then on the plant's first month is read on the same basis as its twenty-fifth.
How to read a plant against it
Each month, compare the billing-meter generation with that month's P90 expected yield. Adjust for grid unavailability and weather before calling a month short. Keep measured generation separate from estimated losses, and flag missing data rather than counting it as zero. A plant below its P90 earns less, and the owner needs to know why.