Site / project engineer
Renevik designs, builds, owns and oversees industrial solar assets. This site and project engineering role supports solar construction, quality checks and verified handover.
Run the site build and keep its daily record accurate so we can commission and hand over the plant with the work verified.
About the work
We build ground-mount solar plants, from engineering and approvals through procurement, construction, commissioning and handover to operations.
We often build several sites at the same time.
What you will do
- Run site execution from civil work through commissioning and handover.
- Coordinate MMS erection and module installation with the installation vendor.
- Coordinate DC and AC works, transformer installation, HT line and termination.
- Resolve site execution queries with the design engineer and installation vendor.
- Submit the daily progress report (DPR) every day: work completed, materials at site and blockers.
- Record material receipts, snags and delays from rain, access roads and right of way.
- Track utility approvals and escalate pending decisions to our technical lead.
- Verify pre-commissioning checks and obtain checklist sign-off before charging.
What you bring
Essential
- Experience in solar EPC site execution, including civil and electrical works.
- Ability to read drawings and coordinate vendors against them.
- Understanding of site safety, pre-commissioning and charging requirements.
- Discipline in daily reporting, material records and snag tracking.
- Willingness to relocate as each EPC order requires.
Good to have
- Experience on ground-mount solar projects.
- Familiarity with HT works and utility approval processes.
- Experience preparing commissioning and handover records.
Where
At our EPC project sites, wherever we build; moving to the next order's site with the work.
Reports to
Our technical lead.
How to apply
Write to [email protected] with your CV.
