Regency Ispat Pvt. Ltd., a significant player in Maharashtra's Iron and Steel industry, sought to boost profitability by reducing energy costs through solar power adoption. Renevik Solar Solutions assisted them in this endeavor by securing a 4.5 MW suitable leasable land with grid connectivity near a substation and the installation of this plant is currently in progress and is expected to be operational by September 2025.
Energy Usage Type
Industrial - Steel Manufacturing
Plant Type
Captive Off-Site
Installation Type
Ground-Mounted